
A CONTROLLED PROCESS FROM SCAN TO VERIFIED DRY INSULATION.
Every ReDry installation follows the same documented, repeatable sequence.
Understanding the cross-section
From moisture map to verified dry insulation
Pre-Scan: Roof MRI Assessment
Entire surface scanned using Roof MRI methodology. Produces a precise moisture map.
Qualification & Planning
Not every wet roof qualifies. Team evaluates membrane, insulation, substrate, and saturation.
Two-Way Vent Installation
Solar-powered vents installed at calculated positions. Two-way design: moisture out, nothing in.
Active Drying Period
Solar energy powers active extraction. Interim scans verify moisture is decreasing.
Post-Scan Verification
Full post-remediation scan confirms dry-condition readings. Roof MRI Verified.
Vent Removal & Closeout
Vents removed, penetrations sealed. Vents returned to ReDry for inspection and reuse. Learn about the lease model →




What your crew needs to know
Standard Tools
No specialized heavy equipment. Designed for experienced commercial roofers.
Scan-Guided Placement
Vent locations from the moisture map. Data-driven, not estimated.
Documentation Provided
All reporting handled through the ReDry system. Done for you.
Every scan. Every project. Every time.
ReDry uses Roof MRI scanning at every stage of the remediation process — pre-scan, mid-project monitoring, and post-scan verification. It’s the only moisture detection system we trust to prove results.
Learn why we chose Roof MRI →See an installation walkthrough.
Live project or recorded demonstration. No obligation.